Get your Priority Risk Assessment Form in 3 easy steps

The priority risk assessment form is made up of three sections. Simply feel in all sections, hit print pdf and get your completed form.

 

These assessments are required by the regulations and should not be confused with the material risk assessments which are contained within asbestos survey reports.

These risk assessments are referred to as priority risk assessments. Priority risk assessments help the duty holder (Client) determine the likely risk of people being exposed to asbestos fibre from the asbestos materials present within their buildings.

These assessments look at:

  • Maintenance activity
  • Occupant activity
  • Likelihood of disturbance
  • Human exposure potential

Priority risk assessments also help to formulate an action plan on how the materials will be safely managed. This will also help determine where asbestos remediation works are required and by when.

 
 

  • Please fill in your email to enable the form
  • General information

  • Material Assessment

    Calculate Material Assessment Score - Use your asbestos survey info
  • TOTAL:
    Material Assessment Outcome:
  • Priority Assessment

    Calculate Your Priority Assessment Score
  • Normal occupant activity in area

  • Likelihood of Disturbance

  • Human Exposure Potential

  • Maintenance Activity

  • Results

Material Risk Assessment:

Priority Risk Assessment:

Total Score:


High>18URGENT ACTION / REMOVE
Medium14-17REMEDIATE / PROTECT, ENCAPSULATE & MONITOR
Low9-13MONITOR SIX TO TWELVE MONTHS
Minor1-8MONITOR ANNUALLY
Print PDF