Swansea engineering firm and building contractor fined for asbestos exposure

Workers were exposed to dangerous asbestos fibres following a catalogue of errors by an engineering company and a building firm during a demolition and refurbishment project in Swansea, a court has heard.

The project was badly managed, with untrained staff put in charge of the operation, and was underpinned by inadequate surveys for the presence of asbestos and poor planning throughout.

Neath Magistrates’ Court was told today (10 January) that Wall Colmonoy Ltd had contracted Oaktree Construction to renovate a building opposite its premises in Pontardawe, Swansea, in December 2010 in order to expand its operations.

The engineering firm had two asbestos management surveys for the site, which, although later deemed to be inadequate, identified the presence of asbestos material and highlighted other areas, such as the ceiling voids, which were presumed to contain asbestos.

Despite this, work was allowed to begin in the building, even though Trebanos-based Oaktree had been advised by the Health and Safety Executive (HSE) that a separate ‘Refurbishment and Demolition Survey’ was also required before any activity commenced.

During the demolition works an asbestos insulation board (AIB) covering a steel column was damaged, and a Wall Colmonoy employee was told to tape plastic bags around it. Work continued in the building for several months with the AIB debris left lying on the floor until an unannounced visit was carried out by an HSE inspector.

A subsequent HSE investigation found that Wall Colmonoy failed to appoint a competent Construction, Design and Management co-ordinator and principal contractor to plan and manage the construction work, and ignored advice from its own health and safety manager to notify HSE of the demolition phase of the project, as is required by law.

Wall Colmonoy also failed to provide a proper assessment of the presence of asbestos and its condition in the building before work started. The surveys they held were poor, as a licensed asbestos removal contractor had warned in advising the company that the information they contained was inadequate.

No-one involved in the management of the project had the skills, training or experience to address health and safety issues, including the risk of asbestos exposure. The company made no efforts to remove or control the risks from the asbestos materials that had been indentified in the reports.

The HSE investigation also found that Oaktree failed to prevent the exposure of its employees to asbestos, and failed to control its spread once it had been damaged.

The company failed to provide a ‘Refurbishment and Demolition Survey’ and its own risk assessment was inadequate because it failed to identify the risks from asbestos.

Furthermore, Oaktree did not carry out a structural assessment of the building and did not provide its staff with asbestos awareness training, despite a recommendation by the HSE in September 2010.

Wall Colomony, of Alloy Industrial Estate, Pontardawe, was fined a total of £16,000 and ordered to pay £3,287 in costs after pleading guilty to breaching Sections 2(1) and 3(1) of the Health and Safety at Work etc. Act 1974.

Oaktree Construction (Wales) Ltd, of Pheasant Road, Trebanos, was fined £8,000 with costs of £2,000 after pleading guilty to breaching Regulations 16 and 11(1) (a) of the of the Control of Asbestos Regulations 2006.

Speaking after the hearing, HSE Inspector, Anne Marie Orrells said:

“Both companies involved in this case demonstrated significant failings throughout the management of the project, which put the lives of their respective workers at risk.

“Demolition and refurbishment work must be properly planned and managed by competent personnel with the right training and experience.

“Proper structural and asbestos surveys must be made and a full risk assessment carried out for all the work to be undertaken.

“Had a Refurbishment and Demolition survey been undertaken, and had a licensed asbestos contractor been used to removal all asbestos materials prior to the work starting, then the risk would have been eliminated.

“Instead this inadequate response left workers exposed to asbestos fibres, which can cause potentially fatal lung disease. The health and safety of workers must not be left to chance.”

Further information on managing asbestos risks can be found on the HSE website at www.hse.gov.uk/asbestos[1]

Notes to editors

The Health and Safety Executive is Britain’s national regulator for workplace health and safety. It aims to reduce work-related death, injury and ill health. It does so through research, information and advice; promoting training; new or revised regulations and codes of practice; and working with local authority partners by inspection, investigation and enforcement. www.hse.gov.uk[2]
Section 2(1) of the Health and Safety at Work etc Act 1974 states: It shall be the duty of every employer to ensure, so far as is reasonably practicable, the health, safety and welfare at work of all his employees.
Section 3(1) of the Health and Safety at Work etc Act 1974 states: It shall be the duty of every employer to conduct his undertaking in such a way as to ensure, so far as is reasonably practicable, that persons not in his employment who may be affected thereby are not thereby exposed to risks to their health or safety.
Regulation 16 of the Control of Asbestos Regulations 2006 states: Every employer shall prevent or, where this is not reasonably practicable, reduce to the lowest level reasonably practicable the spread of asbestos from any place where work under his control is carried out.
Regulation 11(1) (a) of the Control of Asbestos Regulations 2006 states:Every employer shall prevent the exposure of his employees to asbestos so far as is reasonably practicable.

Press enquiries

Regional reporters should call the appropriate Regional News Network press office[3].

Issued on behalf of the Health and Safety Executive by the Regional News Network

Explore this post with your favourite AI tool:

Share this article with AI tools to summarise, remember, or explore the content further.

|

More Articles

asbestos notification waiver

Can HSE Grant an Asbestos Notification Waiver for Urgent Asbestos Removal?

An asbestos notification waiver needs written agreement before urgent licensed work starts, with evidence explaining why the normal wait is not suitable.

Why our values still matter 13 years after Acorn was founded

When a business grows, a lot can change. Teams get bigger, services develop, staff move on or progress with the business, new technology is learned and implemented and clients’ expectations evolve and the way you work has to evolve with ...

asbestos in homes

From play sand to doorstops – the everyday items that could contain asbestos in the home

When most people think of asbestos, they picture old buildings or garage roofs. But, in recent months, asbestos has been making headlines for a very different reason. A number of consumer products have been recalled after testing found traces of ...

Asbestos in football stadiums

Tackling asbestos in Britain’s football stadiums

Football is a game of fine margins. While players focus on making the perfect tackle on the pitch, stadiums have another challenge to contend with off it – tackling the hidden risk of asbestos. As World Cup fever grips the ...

Asbestos Apprentices

Midlands based Asbestos Consultancy Hire two new Apprentice Asbestos Consultants Through Tiro Partnership:

Investing In the future of the Asbestos Industry We at Acorn Analytical Services, are delighted to announce the arrival of two new Apprentice Asbestos Consultants, James Williamson and Lewis Manton, who joined the team this week through our partnership with ...

asbestos in care homes

Asbestos In Sheltered Housing And Asbestos In Care Homes: A Dutyholder Guide

Practical dutyholder guide to asbestos in care homes and sheltered housing, covering duty allocation, management plans, contractor control and resident safety.

found asbestos Stoke-on-Trent

Found Asbestos Stoke-on-Trent: What To Do Next In Your Property

Found asbestos Stoke-on-Trent? Stop work, isolate the area and arrange competent assessment, sampling or survey support.

asbestos refurbishment demolition survey Stoke-on-Trent

Asbestos Refurbishment Demolition Survey Stoke-on-Trent: What You Need Before Work Starts

Asbestos refurbishment demolition survey Stoke-on-Trent for refurbishments, strip out and demolition before work starts. Clear, compliant project planning.

123…37 Next

Leave a comment