Asbestos Survey Reports

An asbestos refurbishment survey in action in Northampton

Do you know what should be in an asbestos survey report? In this article I will outline what information should be provided if the survey has been carried out in line with the HSE guidance document HSG 264.

Whilst it is not a legal requirement to have an asbestos survey carried out, it is a legal requirement to manage asbestos in all non-domestic premises. This responsibility will be for the person who owns the building or has the responsibility for its maintenance and repair of that building. An asbestos survey and therefore an asbestos survey report is the first step towards managing your asbestos risk.

The purpose of an asbestos survey report is to provide you with enough information so that an asbestos register, risk assessment and management plan can all be put into place. It is therefore important that asbestos survey reports are standardised and contain the same information regardless of who has completed it. This was the sole intention of the release of HSG 264.

The asbestos survey should identify the following:

  • The location of asbestos containing materials within your building
  • The particular type of asbestos product
  • The particular type of asbestos fibre
  • The condition of the asbestos materials

This information is then put together into an asbestos survey report which should include a comprehensive account of your situation.

At the beginning of an asbestos survey report an executive summary should give a brief overview of the report, including all of the key information such as location of identified ACMs, areas not accessed and notes on actions.

An introduction should then explain the scope and objectives of the asbestos survey report as well as describing the nature and age of the buildings concerned.

A section containing all of the general site information is then included which sets out the names and addresses of the people and buildings concerned, the date of the survey and the report as well as detailed descriptions of the areas included and excluded.

The survey results should be presented in a format which provides an ease of understanding with diagrams showing areas where ACMs were located and/or presumed. Details will also be included about the type of ACMs, the extent, and level of indication. This section may also include photographs which are beneficial to clients

The results section should also include the accessibility of ACMs, the amount of damage or deterioration, surface treatment if any has been carried out, material assessment score and any action required from the material assessment. This must be provided for all management surveys and where refurbishment surveys and demolition surveys are required for over six months.

The asbestos survey report should then include a conclusion and actions section which summarises the rooms where ACMs were found and any action that is required.

Also provided within an asbestos survey report is the bulk analysis results, which includes the certificate of analysis showing the actual results of the samples taken.

The final section of an asbestos survey report should be the plans section. The plans should include all areas which have been inspected during the asbestos survey. The plans should highlight asbestos locations and locations not inspected and presumed to contain asbestos.

If your asbestos survey report doesn’t contain the above, then it may need updating? We provide free advice and guidance for any asbestos issue. All of our highly trained consultants can provide competitive quotations to meet your requirements.

Get in contact today – Contact us or Get a survey quote!

Explore this post with your favourite AI tool:

Share this article with AI tools to summarise, remember, or explore the content further.


More Articles

asbestos notification waiver

Can HSE Grant an Asbestos Notification Waiver for Urgent Asbestos Removal?

An asbestos notification waiver needs written agreement before urgent licensed work starts, with evidence explaining why the normal wait is not suitable.

Why our values still matter 13 years after Acorn was founded

When a business grows, a lot can change. Teams get bigger, services develop, staff move on or progress with the business, new technology is learned and implemented and clients’ expectations evolve and the way you work has to evolve with ...

asbestos in homes

From play sand to doorstops – the everyday items that could contain asbestos in the home

When most people think of asbestos, they picture old buildings or garage roofs. But, in recent months, asbestos has been making headlines for a very different reason. A number of consumer products have been recalled after testing found traces of ...

Asbestos in football stadiums

Tackling asbestos in Britain’s football stadiums

Football is a game of fine margins. While players focus on making the perfect tackle on the pitch, stadiums have another challenge to contend with off it – tackling the hidden risk of asbestos. As World Cup fever grips the ...

Asbestos Apprentices

Midlands based Asbestos Consultancy Hire two new Apprentice Asbestos Consultants Through Tiro Partnership:

Investing In the future of the Asbestos Industry We at Acorn Analytical Services, are delighted to announce the arrival of two new Apprentice Asbestos Consultants, James Williamson and Lewis Manton, who joined the team this week through our partnership with ...

asbestos in care homes

Asbestos In Sheltered Housing And Asbestos In Care Homes: A Dutyholder Guide

Practical dutyholder guide to asbestos in care homes and sheltered housing, covering duty allocation, management plans, contractor control and resident safety.

found asbestos Stoke-on-Trent

Found Asbestos Stoke-on-Trent: What To Do Next In Your Property

Found asbestos Stoke-on-Trent? Stop work, isolate the area and arrange competent assessment, sampling or survey support.

asbestos refurbishment demolition survey Stoke-on-Trent

Asbestos Refurbishment Demolition Survey Stoke-on-Trent: What You Need Before Work Starts

Asbestos refurbishment demolition survey Stoke-on-Trent for refurbishments, strip out and demolition before work starts. Clear, compliant project planning.

123…37 Next